- The Journey Begins (8/19/2008)
- Basic Rivet Layout (8/24/2008)
- Drilling Sheet Metal (8/24/2008)
- Deburring Metal (8/24/2008)
- Flush Riveting (8/24/2008)
- Backriveting (8/24/2008)
- Removing Bad Rivets (8/24/2008)
- Info Pack and DVD Arrive (8/25/2008)
- Oshkosh: The Spirit of Aviation (9/1/2008)
- Tracking Information (9/9/2008)
- Preview Plans Arrive (9/9/2008)
- Kit Airplane Construction (11/19/2008)
- RV-8 Arrival at Oshkosh (11/27/2008)
- From the Ground Up DVDs (12/14/2008)
- Aircraft Inspection & Repair (12/26/2008)
- First Flight in your Homebuilt (12/27/2008)
- Priming and Corrosion Control (1/4/2009)
- Four Methods of Flush Riveting (1/31/2009)
- 3M Paint Preparation System (2/2/2009)
- SwiftFuel First Flight (2/3/2009)
- Empennage Construction DVDs (4/7/2009)
- Fun with RV-8s (4/22/2009)
- EAA SportAir Workshop (5/2/2009)
- Sheet Metal Tools 101 (5/28/2009)
- Introduction to Rivets (6/12/2009)
- Cutting Aluminum on a Bandsaw (7/6/2009)
- Behold the F-1 Rocket (7/15/2009)
- Oshkosh 2009 (8/4/2009)
- Airventure in HD (8/13/2009)
- Sioux Tools Arrive! (8/18/2009)
- Riveting with a C-Frame (8/20/2009)
- Around the World in an E-LSA (8/22/2009)
- Operation: Airplane Factory (8/27/2009)
- Van’s Aircraft Tour (10/28/2009)
- Empennage Kit Arrives! (11/13/2009)
- Shop Setup and Practice Kit (11/25/2009)
- HS Rear Spar Assembly (11/26/2009)
- AN Hardware Basics (12/4/2009)
- RV-4 and Lancair Formation (12/8/2009)
- The Homebuilder’s Library (12/14/2009)
- HS Front Spar Assembly (12/30/2009)
- Drilling the Horizontal Stab (1/1/2010)
- Deburring and Dimpling (1/2/2010)
- Surface Prep and Priming (1/3/2010)
- Riveting the HS Spars (1/4/2010)
- Skin Riveting & Murphy’s Law (1/5/2010)
- The New Industrial Revolution (1/31/2010)
- Burt Rutan on Big Think (3/3/2010)
- Closing the Horizontal Stab (4/15/2010)
- The Vertical Stab Goes Down (4/17/2010)
- Vertical Stab Complete (4/19/2010)
- Horizontal Stab Quality Control (4/20/2010)
- ELT Installation and Testing (4/22/2010)
- Foxjet ’77 (5/14/2010)
- EAA Old School (5/28/2010)
- Rudder Progress (7/1/2010)
- Vertical Power VP-X Wiring (7/15/2010)
- Rudder Horn Brace Redux (7/24/2010)
- Finishing the Rudder (7/24/2010)
- Oshkosh 2010 (8/2/2010)
- Right Elevator Construction (8/11/2010)
- Building the Left Elevator (8/12/2010)
- Wing Kit Arrives! (10/29/2010)
- The Dreaded Trim Tab (11/2/2010)
- ICON: The Future of Flight? (12/2/2010)
- RV-8 over San Francisco (12/5/2010)
- Preparing the Ailerons (2/8/2011)
- Main Wing Spar Prep (2/25/2011)
- Rear Wing Spars (3/3/2011)
- Aileron Pushrods and Torque Tubes (3/7/2011)
- Flaps and Ailerons Assembly (3/17/2011)
- The Synergy Project (5/1/2011)
- Mike Busch on Engine Monitors (6/15/2011)
- Wing Kit Progress (7/4/2011)
- Gooping up the Fuel Tanks (7/22/2011)
- Riveting the Fuel Tank Ribs (7/23/2011)
- Oshkosh 2011 (8/10/2011)
- Wire Stripping and Crimping (8/25/2011)
- Fuel Vent Tube Installation (8/28/2011)
- Dynon Pitot Tube Installation (9/11/2011)
- Duckworks Landing Light Mounts (9/11/2011)
- Circuit Protection (9/14/2011)
- Drilling Acrylics (11/14/2011)
- Soldering Wire Leads (11/20/2011)
- Crimping Wire Terminals (11/20/2011)
- Identifying Mil-Spec Wire (11/20/2011)
- Finishing the Fuel Tanks (1/7/2012)
- Riveting the Wings (2/19/2012)
- Wingtip Lens Fitting (2/25/2012)
- Piano Hinges (3/1/2012)
- Supersonic Flight and Shock Waves (3/19/2012)
- Oshkosh: Air to Air (3/26/2012)
- Fuselage Kit Arrives (4/28/2012)
- Kickstarter Rejects Synergy? (5/1/2012)
- Firewall Layout (5/4/2012)
- The Road So Far (5/5/2012)
- Inspecting and Servicing Gascolators (5/9/2012)
- Kirby Chambliss in HD (5/11/2012)
- Riveting the Firewall (5/28/2012)
- Assembling the Gear Towers (5/31/2012)