With both stabs done, we begin work on the rudder.
Archive for July, 2010
July15
Vertical Power VP-X Wiring
Marc Ausman demonstrates basic aircraft electrical wiring with the VP-X.
July24
Finishing the Rudder
Before the big pilgrimage to Oshkosh, Dad and I polish off the last of the rudder.
